top of page
TMS-GRID-LOGO-WHITE.png

CHARITY GOLF DAY

2025

TMS Grid hosted our first annual TMS Grid Charity Golf Day at Close House Golf Club in June 2025.

 

TMS are proud sponsors of Poppy's Light Foundation, with all proceeds from the day going to the foundation.

 

It really was a superb day, for a fantastic cause.

Thank you to everyone who attended! 

The 2026 Golf Day will be announced here shortly

LOGO-2-sm-white.png
Golf-day-square.png
a-team-lineup.png

© 2023 TMS GRID LIMITED All rights reserved.

Proud and committed sponsors of

LOGO-2-sm-black.png

JOINTING

LV, 11kV, 33kV, 66kV, 132kV (up to 275kV in NI)

OVER HEAD LINE WOODEN POLE

–LV, 11kV, 33kV, 66kV, 132kV (up to 275kV in NI)

OVER HEAD LINE STEEL TOWER

–11kV,  33kV,  132kV (up to 275kV in NI)

  • Instagram
  • Linkedin

SUBSTATION INSTALLATION

–11kV,  33kV,  66kV,  132kV (up to 275kV in NI)

ELECTRICAL DESIGN OF DISTRIBUTION NETWORKS COVERING

–HV Cable Networks 11kV, HV Cable Networks 33kV, HV Cable Networks 132kV

–Substation 11kV, 33kV, 66kV, 132kV

–HV Over Head Networks 11kV, 33kV, 66kV, 132kV

–Over Head Wooden Pole 11kV, 33kV, 66kV, 132kV

–Over Head Steel Tower 11kV, 33kV, 66kV, 132kV

bottom of page